At the end of September, 2003 construction 5-level underground parking MFC "Alfa-Arbat-Center” which designing became for us the important stage on a way of perfection of technology of the construction top-down method based on own experience and "know-how" was finished.
2002-2003, 5-level underground parking MFC "Alfa-Arbat-Center” - from a history of construction.