Construction technology: bored piles and columns, jet-grouting, jet-columns, grouting, diaphragm walls, shoring of excavation, consolidation of foundation and foundation bed, jet-grouting curtain, micropiles, anchors, lining, waterproofing, bed drainage, dewatering.

The catalogue of the dwf-drawings: Projects and technical solutions in the field of underground construction (bored columns, top-down (top down) construction method, diaphragm walls, shoring of excavation, jet-grouting, grouting, lining...), bed drainage, dewatering, waterproofing of buildings and constructions:
  1. 02_trans_opal_en.dwf: JSK "Transneft" office building. Geological and hydrogeological conditions. The diaphragm wall forms.

  2. FIG1-1-en.dwf: The perimetrical walls from the secant piles and bored columns erection. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  3. FIG1-2-en.dwf: Cut-and-cover soil excavation in the pit to the -3.60 m level. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  4. FIG1-3-en.dwf: The slab at the +0.30 m level concreting. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  5. FIG1-4-en.dwf: Excavation under concrete slab to the -7.05 m level. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  6. FIG1-5-en.dwf: The temporary support erection, excavation under concrete slab to the -11.10 m level. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  7. FIG1-6-en.dwf: Foundation slab waterproofing erection, foundation slab concreting. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  8. FIG1-7-en.dwf: The protective walls on -2, -3 stores and the slab at the -6.60 m level concreting. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  9. FIG1-8-en.dwf: The slab at the -3.15 m level and the protective walls on -1 store concreting. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  10. FIG1-9-en.dwf: The aboveground section comletion. Reconstruction and restoration of A.S. Pushkin Museum complex and construction of funds storage at Prechistenka street (Moscow).

  11. Genplan-en.dwf: Construction of underground parking of the MFBC "Alfa-Arbat-Center" by top-down (top down) construction method. Situation scheme.

  12. Metro_Kollektor-en.dwf: Underground parking "Alfa-Arbat-Center" erection.

  13. Ob1-en.dwf: In-situ reinforced concrete lining for a single-vault subway-station. Variant 1. Data on our research development work.

  14. Ob2a-en.dwf: Precast with cast-in-place reinforced concrete lining for a single-vault subway-station. Variant 2a. Data on our research development work.

  15. Ob2-en.dwf: Precast with cast-in-place reinforced concrete lining for a single-vault subway-station. Variant 2. Data on our research development work.

  16. Ob3-en.dwf: In-situ reinforced concrete lining for a single-vault subway-station. Variant 3. Data on our research development work.

  17. Ob4-en.dwf: Precast with cast-in-place reinforced concrete lining for a single-vault subway-station. Variant 4. Data on our research development work.

  18. Ob5a-en.dwf: Precast with cast-in-place reinforced concrete lining for a single-vault subway-station. Variant 5a. Data on our research development work.

  19. Ob5-en.dwf: Precast with cast-in-place reinforced concrete lining for a single-vault subway-station. Variant 5. Data on our research development work.

  20. Ob6a-en.dwf: In-situ reinforced concrete lining for a single-vault subway-station. Variant 6a. Data on our research development work.

  21. Ob6b-en.dwf: In-situ reinforced concrete lining for a single-vault stub track. Variant 6b. Data on our research development work.

  22. Ob6-en.dwf: In-situ reinforced concrete lining for a single-vault subway-station. Variant 6. Data on our research development work.

  23. Ob7a-en.dwf: Precast with cast-in-place reinforced concrete lining for a single-vault subway-station. Variant 7a. Data on our research development work.

  24. Ob7-en.dwf: Precast with cast-in-place reinforced concrete lining for a single-vault subway-station. Variant 7. Data on our research development work.

  25. OBDV1-en.dwf: In-situ reinforced concrete vaulted lining for an underground parking. Variant 1. Data on our research development work.

  26. OBDV2-en.dwf: In-situ reinforced concrete lining for an underground parking. Variant 2. Data on our research development work.

  27. OBDV3-en.dwf: In-situ reinforced concrete lining for an underground parking. Variant 3. Data on our research development work.

  28. OBDV4-en.dwf: In-situ reinforced concrete lining for a single-vault subway-station, integrated with an underground parking. Data on our research development work.

  29. OBDV5-en.dwf: In-situ reinforced concrete vaulted lining for subway interchange stations, integrated with an underground parking. Data on our research development work.

  30. Plan6-en.dwf: Underground parking "Alfa-Arbat-Center" erection. The scheme of the temporary support. Upper and lower tier.

  31. PLAN-en.dwf: Reconstruction and restoration of A.S. Pushkin Museum Complex and construction of the funds storage at Prechistenka Street. The panorama of performed work.

  32. PLAN-en-33.dwf: The plan in the level of the upper floor. Underground parking for 184 cars at Revolution Square in Moscow.

  33. POPERECHNIK-en.dwf: The vaulted lining cross-section. Underground parking for 184 cars at Revolution Square in Moscow.

  34. Razrez-en.dwf: Construction of underground parking of the MFBC "Alfa-Arbat-Center" by top-down (top down) construction method. Longitudinal section.

  35. Str_4-en.dwf: Reconstruction and restoration of A.S. Pushkin Museum Complex. Consolidation of foundations of building 4 by jet-columns.

  36. Sx1-12-en.dwf: In-situ reinforced concrete linings for a underground parking. Data on our research development work.

  37. TEXNOL_BETON-en.dwf: The vaulted lining erection technology. Underground parking for 184 cars at Revolution Square in Moscow.

  38. Texnologi-en.dwf: Reinforcement of foundations with "jet-grouting" technology. Pushkin Museum Complex and construction of the funds storage at Prechistenka Street. The panorama of performed work.

Autodesk, Inc.
In order to view drawings in DWF format you need to download and install Express Viewer on your computer from AutoDesk site.

Main page

Previous

Begin page
Copyright © 2001-2022 "Yurkevich Engineering Bureau Ltd." / All Rights Reserved


  Rambler's Top100