Construction technology: bored piles and columns, jet-grouting, jet-columns, grouting, diaphragm walls, shoring of excavation, consolidation of foundation and foundation bed, jet-grouting curtain, micropiles, anchors, lining, waterproofing, bed drainage, dewatering.


Pass to page of registration of the order Bored columns – the new reality — 24 €

Bored columns – the new reality. Russian version, PDF, 1621 Kb - 15 pages, A4 + The technology of bored column сonstruction, FLASH-presentation, 229 Kb.


       The congested conditions of metropolis historic centres and complicated geological and hydro-geological conditions during the construction of new building zero cycles and underground car parkings force to apply semi-closed method as the most safe for the surrounding built-up area.

       In that case the ground excavation in a pit is performed under the protection of floor-slabs that are erected according to the «top-down» method and are supported with intermediate temporary steel props or permanent reinforced concrete ones.

       Due to the complexity of vertical position ensuring, reliable coupling with the floor-slabs and required bearing capacity during exploitation, these props, as a rule, are made as temporary steel props reinforced by reinforcement bars and concrete solidification during the construction completion phase.

       Mach more rarely the permanent props are used that are erected in the bored holes or short trenches using precast concrete elements joined during the assembly. Complicated execution of reliable butt-joints of elements and units connection with the underground storeys floor-slabs as well as additional expenditure due to manufacture and transportation are hardly attractive.

       The subject of the article is a detailed consideration of a fundamentally new technology for the erection of bored columns made of in-situ reinforced concrete and of high execution accuracy and bearing capacity. The author especially introduces the term «bored columns» into practice to point out distinctions of applied for the first time in the world decision from the well-known bored piles or precast reinforced concrete columns erected in the bored holes.
Bored columns on construction of underground five-floor parking at «Alfa-Arbat-Center» Multifunctional Business Center in Moscow      


       This technological innovation allows use a combined construction method that provide concurrent erection of the buildings underground parts applying the «top-down» method and the "down-top" one – of the aboveground parts. In this case it is possible sensu stricto to «suspend» totally the buildings aboveground parts together with lift wells and stairwells above the excavation pits being deepened under them.

       The technology of a bored column erection was considered in details in the Flash-presentation where 14 successive phases are presented.
      Underground five-floor parking at «Alfa-Arbat-Center» Multifunctional Business Center in Moscow. A Temporary building ground on a coating.

Main page

Previous

Begin page
Copyright © 2001-2022 "Yurkevich Engineering Bureau Ltd." / All Rights Reserved

  Рейтинг@Mail.ru   Rambler's Top100